• Home
  • Pagina di esempio
9Colonne
No Result
View All Result
No Result
View All Result
9Colonne
No Result
View All Result
Home Sito interno Archivio BigItaly focus - Inglese

ENEL GP AND ENDESA CHILE SIGN CONTRACT FOR SUPPLY OF RENEWABLES

it@withub.it by it@withub.it
7 Novembre 2014
in App HP News INGLESE, Archivio BigItaly focus - Inglese
0
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Santiago – Enel Green Power, acting through its subsidiary Enel Green Power Chile Ltda, and Empresa Nacional de Electricidad SA have signed a long-term power supply contract, which also envisages the sale of the green certificates, with a term of around 20 years for two wind power projects and about 25 years for three photovoltaic projects. The contract, worth an estimated total of approximately 2.3 billion US dollars, will allow Enel Green Power Chile to develop wind and photovoltaic plants for a total installed capacity of about 307 MW and a total investment of approximately 611 million US dollars. (9colonne)

Related Posts

  • Time for landscapes, environment and traditions of Sardinia

    (Jan. 10) - It starts again from Norway the European campaign to promote tourism in…

  • A €117 million contract for Astaldi in Chile

    Apr. 18 - The Astaldi Group has been awarded a contract in Chile amounting to…

  • Automotive, BNL and SACE for the growth of GLM abroad

    (Dec. 18) - Lying between the valleys of the Tordino and Vomano, the fame of…

Previous Post

In mostra l’arte
e l’architettura della Farnesina

Next Post

Business, il vino italiano punta sulla sostenibilità

Next Post

"المجموعة الأوروبية"، الرغيف والمقددات تدخل سجل المنتجات المحمية

Lascia un commento Annulla risposta

Il tuo indirizzo email non sarà pubblicato. I campi obbligatori sono contrassegnati *

Articoli recenti

  • OLIMPIADI: PODCAST RAIPLAY, DIECI ATLETI SI RACCONTANO
  • OBESITÀ, SCHILLACI: LEGGE PASSO IN AVANTI PER LA TUTELA DELLA SALUTE
  • POLIZIA, LEONE XIV RICEVE NUMERO SPECIALE POLIZIA MODERNA “PACE E SICUREZZA”
  • BANDECCHI, AVS, PD, M5S, PSI E RC: ORA BASTA, SINDACO SI DIMETTA
  • CNR, STUDIO RICONDUCE IL DIPINTO DI TURNER AL PONTE DEL DIAVOLO DI BLERA (VT) (3)

Commenti recenti

Nessun commento da mostrare.
  • Home
  • Pagina di esempio

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

No Result
View All Result
  • Home
  • Pagina di esempio

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.