• Home
  • Pagina di esempio
9Colonne
No Result
View All Result
No Result
View All Result
9Colonne
No Result
View All Result
Home Sito interno Archivio BigItaly focus - Inglese

A new wind farm for Enel Green Power in Chile

it@withub.it by it@withub.it
27 Dicembre 2013
in Archivio BigItaly focus - Inglese
0
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Dec. 27 – Enel Green Power completed construction of a new wind farm in Chile in the Valle de los Vientos, in the region of Antofagasta. The new facility consists of 45 wind turbines of 2 mw each, for a total installed capacity of 90 mw. At full capacity, the plant, held by Eólico Parque Valle de los Vientos, a subsidiary of Enel Green Power Chile Ltda, will produce up to 200 GWh per year, avoiding the emission of more than 165.000 tons of CO2. The construction of the wind farm, in line with the growth targets set out in the 2013-2017 EGP business plan, required a total investment of about $170 million.

Related Posts

  • Enel Green Power: first wind farm in Chile enters service

    (Mar 25th) – Enel Green Power has connected to the grid its first wind farm…

  • Enel Green Power, wind farm in Romania enters operation

    (Aug. 30) - Enel Green Power has completely connected the new Moldova Noua wind farm…

  • Two new wind farms for Enel Green Power in Spain

      Mar. 21 - Enel Green Power España connected to two new wind farms in…

Previous Post

Nuovo parco eolico di Enel Green Power in Cile

Next Post

Pirelli, al via la collaborazione per la gomma sintetica

Next Post

ONCOLOGIA: PREMIO INTERNAZIONALE AL RICERCATORE VENEZIANO MASSIMO GION

Lascia un commento Annulla risposta

Il tuo indirizzo email non sarà pubblicato. I campi obbligatori sono contrassegnati *

Articoli recenti

  • OLIMPIADI: PODCAST RAIPLAY, DIECI ATLETI SI RACCONTANO
  • OBESITÀ, SCHILLACI: LEGGE PASSO IN AVANTI PER LA TUTELA DELLA SALUTE
  • POLIZIA, LEONE XIV RICEVE NUMERO SPECIALE POLIZIA MODERNA “PACE E SICUREZZA”
  • BANDECCHI, AVS, PD, M5S, PSI E RC: ORA BASTA, SINDACO SI DIMETTA
  • CNR, STUDIO RICONDUCE IL DIPINTO DI TURNER AL PONTE DEL DIAVOLO DI BLERA (VT) (3)

Commenti recenti

Nessun commento da mostrare.
  • Home
  • Pagina di esempio

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

No Result
View All Result
  • Home
  • Pagina di esempio

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.