• Home
  • Pagina di esempio
9Colonne
No Result
View All Result
No Result
View All Result
9Colonne
No Result
View All Result
Home Sito interno Archivio BigItaly focus - Inglese

ENI BEGINS PRODUCING IN THE WEST HUB PROJECT

it@withub.it by it@withub.it
9 Dicembre 2014
in App HP News INGLESE, Archivio BigItaly focus - Inglese
0
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Luanda – Eni started production from the West Hub Development Block 15/06, located in offshore Angola, about 350 kilometers north west of the capital, Luanda, and 130 kilometers east from the town of Soyo. The production, obtained through the FPSO N’Goma vessel, is currently 45.000 barrels of oil per day. The production ramp-up will be completed over the next few months, reaching up to 100.000 barrels of oil per day. The 15/06 Block also includes the East Hub Development, which is expected to start production in 2017, and will allow overall production from the Block to reach the level of 200,000 barrels of oil per day. (9Colonne)

Related Posts

  • Eni kicks off production in the West Hub

    Dec. 9 – Yesterday, a special ceremony in Luanda kicked off production at the Eni…

  • ايني، بدء إنتاج مشروع WEST HUB

    لواندا ـ بدأت شركة ايني الإنتاج من مشروع West Hub Development حقل 15/06، الذي يقع…

  • ENI is the “Mécène Principal” of the Louvre exhibit on Raphael

    Oct. 11 – ENI is the Mécène Principal for the “Raphael – les dernières années,…

Previous Post

Italian design takes the stage thanks to Magistretti

Next Post

LIBERA IN BRUSSELS FOR THE DAY AGAINST CORRUPTION

Next Post

الخطوط الجوية التركية وPugliapromozione معا من أجل السياحة

Lascia un commento Annulla risposta

Il tuo indirizzo email non sarà pubblicato. I campi obbligatori sono contrassegnati *

Articoli recenti

  • OLIMPIADI: PODCAST RAIPLAY, DIECI ATLETI SI RACCONTANO
  • OBESITÀ, SCHILLACI: LEGGE PASSO IN AVANTI PER LA TUTELA DELLA SALUTE
  • POLIZIA, LEONE XIV RICEVE NUMERO SPECIALE POLIZIA MODERNA “PACE E SICUREZZA”
  • BANDECCHI, AVS, PD, M5S, PSI E RC: ORA BASTA, SINDACO SI DIMETTA
  • CNR, STUDIO RICONDUCE IL DIPINTO DI TURNER AL PONTE DEL DIAVOLO DI BLERA (VT) (3)

Commenti recenti

Nessun commento da mostrare.
  • Home
  • Pagina di esempio

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

No Result
View All Result
  • Home
  • Pagina di esempio

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.