• Home
  • Pagina di esempio
9Colonne
No Result
View All Result
No Result
View All Result
9Colonne
No Result
View All Result
Home Sito interno Archivio BigItaly focus - Inglese

Enel Green Power: first wind farm in Chile enters service

it@withub.it by it@withub.it
25 Marzo 2013
in Archivio BigItaly focus - Inglese
0
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

(Mar 25th) – Enel Green Power has connected to the grid its first wind farm in Chile, located in Talinay (region of Coquimbo). The Talinay wind farm has an installed capacity of 90 MW and will be able to generate up to 200 million kWh per year once fully operational. The new plant, designed and developed by Danish company Vestas, is comprised of forty-five 2 MW wind turbines also built by Vestas. Construction of the Talinay plant required a total of, approximately, 165 million US dollars. With the start-up of operations at Talinay, Enel Green Power has strengthened its presence in the promising Chilean renewable energy market by expanding its installed capacity to 182 MW. The Company is currently in the process of constructing a 90 MW wind farm in Valle de los Vientos, in region II of Antofagasta. Once completed, this wind farm will bring Enel Green Power’s installed capacity in Chile to 272 MW. (Peg)

Related Posts

  • Enel Green Power, wind farm in Romania enters operation

    (Aug. 30) - Enel Green Power has completely connected the new Moldova Noua wind farm…

  • A new wind park for Enel Green Power in Spain

    (Oct. 5) The Acampo Hospital wind park, in Saragossa (Aragon), is now connected to Enel’s…

  • Two new wind farms for Enel Green Power in Spain

      Mar. 21 - Enel Green Power España connected to two new wind farms in…

Previous Post

In undici città americane l’Italian Film Festival

Next Post

Videogames, 10 Italian companies at the Game Connection

Next Post

AnsaldoBreda punta al mercato cinese delle metropolitane

Lascia un commento Annulla risposta

Il tuo indirizzo email non sarà pubblicato. I campi obbligatori sono contrassegnati *

Articoli recenti

  • OLIMPIADI: PODCAST RAIPLAY, DIECI ATLETI SI RACCONTANO
  • OBESITÀ, SCHILLACI: LEGGE PASSO IN AVANTI PER LA TUTELA DELLA SALUTE
  • POLIZIA, LEONE XIV RICEVE NUMERO SPECIALE POLIZIA MODERNA “PACE E SICUREZZA”
  • BANDECCHI, AVS, PD, M5S, PSI E RC: ORA BASTA, SINDACO SI DIMETTA
  • CNR, STUDIO RICONDUCE IL DIPINTO DI TURNER AL PONTE DEL DIAVOLO DI BLERA (VT) (3)

Commenti recenti

Nessun commento da mostrare.
  • Home
  • Pagina di esempio

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

No Result
View All Result
  • Home
  • Pagina di esempio

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.