• Home
  • Pagina di esempio
9Colonne
No Result
View All Result
No Result
View All Result
9Colonne
No Result
View All Result
Home Sito interno Archivio BigItaly focus - Inglese

ENEL GREEN POWER COMPLETES ITS THIRD WIND FARM IN BRAZIL

it@withub.it by it@withub.it
9 Aprile 2014
in App HP News INGLESE, Archivio BigItaly focus - Inglese
0
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Morro do Chapéu – Enel Green Power has completed the construction of the third and final plant at the Cristal wind power complex in the town of Morro do Chapéu, in the State of Bahia, Brazil. The new Cristal wind farm, which gives its name to the entire complex, is composed of 13 turbines of 2.3 MW each, with an overall installed capacity of 30 MW, and is able to generate more than 145 million kWh per year. The Cristal complex therefore now reaches an overall installed capacity of 90 MW and can generate more than 400 million kWh of power a year. The construction of the wind complex required a total investment of approximately 165 million euros. With the new wind farm, Enel Green Power’s total installed capacity in Brazil now exceeds 260 MW, of which more than 90 MW of hydroelectric capacity. Enel Green Power thus strengthens its operations in the promising renewable generation market in Brazil, one of the world’s leading producers of clean energy thanks to more than 100 thousand MW of installed renewables capacity, representing over 85% of the country’s total installed capacity. (9colonne)

Related Posts

  • A new wind farm for Enel Green Power in Chile

    Dec. 27 – Enel Green Power completed construction of a new wind farm in Chile…

  • Enel Green Power: first wind farm in Chile enters service

    (Mar 25th) – Enel Green Power has connected to the grid its first wind farm…

  • Enel Green Power, wind farm in Romania enters operation

    (Aug. 30) - Enel Green Power has completely connected the new Moldova Noua wind farm…

Previous Post

“PUNTO ITALIA” AT SIMTOS

Next Post

RIFORME, DEPUTATI PD: NO ESCLUSIONE ELETTI ALL’ESTERO DA CAMERA

Next Post

L’ITALIA ALLA IRAQ MEDICARE 2014

Lascia un commento Annulla risposta

Il tuo indirizzo email non sarà pubblicato. I campi obbligatori sono contrassegnati *

Articoli recenti

  • OLIMPIADI: PODCAST RAIPLAY, DIECI ATLETI SI RACCONTANO
  • OBESITÀ, SCHILLACI: LEGGE PASSO IN AVANTI PER LA TUTELA DELLA SALUTE
  • POLIZIA, LEONE XIV RICEVE NUMERO SPECIALE POLIZIA MODERNA “PACE E SICUREZZA”
  • BANDECCHI, AVS, PD, M5S, PSI E RC: ORA BASTA, SINDACO SI DIMETTA
  • CNR, STUDIO RICONDUCE IL DIPINTO DI TURNER AL PONTE DEL DIAVOLO DI BLERA (VT) (3)

Commenti recenti

Nessun commento da mostrare.
  • Home
  • Pagina di esempio

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

No Result
View All Result
  • Home
  • Pagina di esempio

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.