Bucarest – Astaldi announces that, as part of a joint venture, has been awarded two new contracts in Romania, both related to the rehabilitation of the Frontieră-Curtici-Simeria railway line, part of the Pan-European Corridor IV. The total value of the works to be performed equals approximately 776 million euro, and Astaldi’s share is 42%. The contracts include Lots 2A and 2B of the new railway corridor for the rehabilitation and stabilisation of 80 kilometres of railway and 11 stations, the ERTMS telecommunications and signalling system, as well as theconstruction of 30 bridges and a tunnel. (9colonne)