Accra – Eni, Vitol and Ghana National Petroleum Corporation (GNPC) signed today with the President of the Republic of Ghana, John Dramani Mahama, and the Minister of Petroleum, Emmanuel Armah-Kofi Buah, the agreement to proceed with the OCTP integrated oil & gas project in Ghana. First oil is expected in 2017, first gas in 2018 and the peak production will be 80,000 boed in 2019. (9colonne)