Mar. 21 – Enel Green Power España connected to two new wind farms in the province of Málaga, adding an additional 70 MW to its installed capacity in Andalusia. The Angosturas system, located in the municipalities of Campillos and Teba, consists of 18 wind turbines of 2 MW for a total installed capacity of 36 MW. The energy produced, estimated at 68 million kWh per year, is able to meet the annual energy requirements of more than 25,000 Spanish households and avoid the emission of over 50,000 tons of CO2. The Madroñales system, with an installed capacity of 34 MW, is located in the municipalities of Almargen, Campillos and Teba and consists of 17 wind turbines of 2MW. It can produce up to 77 million kWh, the annual needs of approximately 28,000 Spanish households and avoid the emission of more than 56 000 tons of CO2. The two new plants, included in pre-registration of Enel’s business plan in Spain, add 1864 MW to the total 200 MW of renewable energy produces by Enel Green Power in Andalusia. Enel Green Power is present in Spain and Portugal through Enel Green Power España (EGPE), 60% owned by Enel Green Power and 40% owned by Endesa.